REFINERY AND PETROCHEMICAL COMPLEX - Capital Projects
/ 2012. -2021. /

REFINERY OKTA, Republic of Northern Macedonia

  • Installation and Welding works on Pipelines and Equipment – 2012.

REFINERY SCHWEDT, Germany

  • Revision and Repair works of Boiler Pressure Parts – 2017.
  • Prefabrication and Installation of Pipelines – 2017.
  • Projekt Verbundstillstand Step 2, Teilprojekte TP3 – 2018.
  • Prefabrication & Installation of Piping, Material: 1.4541, 16Mo3, P235GH-TC1, A 335Gr.P5.

NIS Gazprom Neft, Refinery Pancevo

  • Capital Modernization and Reconstruction of Refinery – 2012.
  • MONT-R has participated at Piping Installation part of total 2 237t  Refinery Pancevo since 2012.
    Refinery has a Raw Oil processing capacity of 4.8 million tons per year.
  • Major Overhaul of the Pancevo Oil Refinery in 2019.
  • LOT 1 -Major Overhaul of FCC S-2300, S-2500 & Alkylation S-2600.
  • DCU Plant Project WP1, Unit S-5900 & S-5950 – 2019.
  • Pipe Erection at Unit S-5900, S-5950 & S-5300 – Area A4,  piping SMLS B36.10M BE A106-B, A312-TP304L A333-6,
    including Prefabrication & Installation of Pipe Supports and Stem Tracing.

REFINERY SHELL - QATAR Train 2 Extension in Qatar Shell GTL Ltd Ras Laffan Industrial City

Aerial,View,Oil,And,Gas,Tank,With,Oil,Refinery,Background
  • Installation and Welding works on Pipelines and Equipment – 2017.

TRANSMISSION GAS PIPELINE (Interconnector) in Serbia

  • Valve Block BVS15 and Measuring STATION GMS4, 2019-2020.
  • GMS1-BVS1-POSM Receipt Dispatching Purification Point -STATION, 2019-2020.
  • Receiving and Dispatching Purification – COMPRESSOR STATION, 2019-2020.
  • Total number of 40 000 WDInch, number of Welding Joints 1150, Piping Class 6CX0C3U & 6СХ0С3A,
    Diameters:

    – 48” (1219 x 22.23 mm) 256 WJ,
    – 36” (914.4 x 17.48 mm) 25 WJ,
    – 24” (609.6 x 25.4 mm) 117 WJ,
    – 18” (457.2 x 20.62 mm) 258 WJ,
    – 16” 12” 8” 4” 3” 2”-1/2”.

Construction of the BRIDGE on ADA

  • Installation of GAS PIPELINE on the construction of the BRIDGE on ADA, Dimensions: Ø323.9 x 6.4mm, Material: API 5L Gr B, including Fabrication and Installation of support brackets for Gas Pipeline – 2022.